Projects
Referenze
2020-2025
-
HOMA Pharmed2025Teheran IRAN
-
OHBfrom 2021 to presentMilanoConstruction of ISO 7 and ISO 5 cleanroom in the high-tech electronics sector (satellite assembly).
Period: from 2021 to present -
ADARE PHARMAfrom 2020 to presentPessano con Bornago (MI)Pharmaceutical departments and processes implementation:
- Implementation of a mill inertization system
- Revamping of the solid-oral dosage department
- Construction of a new packaging building and warehouse
Period: 2020 to present -
FLAMMAfrom 2015 to presentChignolo d'Isola e Isso (BG)Construction of a new departments such as: API product finishing, dispensing, and analytical & research laboratories.
Period: from 2015 to present -
TEOFARMAfrom 2020 to presentPavia (PV)Construction of a new departments such as: solid-oral dosage and packaging.
Period: from 2020 to present
2010-2020
-
HPBfrom 2014 to presentMezzovico CHConstruction for the production of recombinant APIs (Up-stream and Down Stream) – 2,000 sqm
Period: from 2014 to present -
CPC BIOTECHfrom 2010 to presentChignolo d'Isola e Isso (BG)Construction of new pharmaceutical departments and processes:
- Fermentation and DSP (Downstream Processing) purification department
- +2 / 8 °C cold storage room
- Enzyme production department
Period: from 2010 to present -
EUTICALSfrom 2010 to presentRozzano (MI) - Varese (VA) - Lodi (LO)Construction of departments such as: API product finishing, Dispensing, Analytical and research laboratories, Temperature-controlled product storage
Period: from 2010 to present -
DIPHARCOfrom 2010 to presentCalvenzano (BG)Construction of a pharmaceutical secondary packaging department.
Period: from 2010 to present -
FARMAC ZABBANfrom 2012 to presentCalderara Di Reno Bologna (BO)Cleanroom for the production of medical devices, hospital sector.
Period: from 2012 to present -
NEOMEDanno 2012Casorezzo (MI)Construction of a department for the production of products for industrial microbiology and the hospital sector.
Period: from 2012 to present
2000-2010
-
FISfrom 2003 to presentMontecchio Maggiore, Lonigo, Termoli e Delmar MontrealConstruction of various departments from API product finishing to research and analysis labs, to temperature-controlled product storage.
Period: from 2003 to present -
FRESENIUS KABI2008Isola della Scala VRCompany operating in the infusion sector where we built:
- Cleanrooms for the preparation and filling of glass and plastic vials
- Chemical and microbiological testing laboratories
- Preparation skids
Area: 3,000 m²
Period: 2008–2016 -
EURANDfrom 2002 to presentPessano C/B MIPlant expansion in two main phases for new GMP research areas, solid oral product packaging and temperature-controlled warehouses.
Period: from 2002 to present -
FIEGE LOGISTICSfrom 2002 to 2010Caleppio di Settala MI - Calvenzano MIConstruction of medicinal repackaging departments, temperature-controlled warehouses, and cold rooms.
Period: from 2002 to 2010 -
SOFFIERIA MEZZADRI2007Felino PRCleanrooms for packaging of small bottles, ampoules, and vials
Period: from 2007 to 2008 -
CLINICA SAN FRANCESCOfrom 2002 to 2004BergamoConstruction of operating block and analysis laboratories – approx. 1,200 sqm
Period: from 2002 to 2004
1980-2000
-
PierrelPotenza - Baragiano PZPotenza - Baragiano PZConstruction of departments for the production of sterile infusion liquids in vials and bags.
Period: from 1993 to present -
Farmoprintfrom 1993 to presentPiacenzaCleanrooms for aluminum blister printing production.
Period: from 1993 to present -
Bea technologiesfrom 1995 to presentPero MIConstruction of ISO 7 – ISO 5 cleanrooms for the production of sterilizing cartridges – 1,200 sqm
Period: from 1995 to present -
IBSA e Gelfifarmafrom 1993 to 2010Lugano - LodiDesign and/or construction of various buildings and departments for diverse pharmaceutical productions – total surface: 10,000 sqm
Period: from 1993 to 2010 -
Recordatifrom 1997 to 2004MilanoRenovation of the Via Aretusa plant for solid oral, liquid, cream and sterile injectable departments, primary and secondary packaging.
Approx. surface: 6,000 sqm
Period: from 1993 to 2004 -
Zenecafrom 1993 to 2001CaponagoDesign of HVAC systems for sterile injectable departments in asepsis and pharmaceutical product storage.
Period: from 1993 to 2001 -
Pierrelfrom 1993 to 1997CapuaConstruction of production and purification departments for antibiotics via fermentation.
Period: from 1993 to 1997 -
Molteni Farmaceuticifrom 1993 to 1997Scandicci (Italy, FI) and Krakow (Poland)Construction of various departments for injectable and oral liquid production.
Period: from 1993 to 1997 -
Seronofrom 1994 to 1996Aubonne CHUpgrading of biotechnology departments
Period: from 1994 to 1996 -
Gentilifrom 1987 to 1995PisaDesign of solid oral revamping – 800 sqm
Period: from 1987 to 1995 -
Schering Ploughfrom 1988 to 1995Comazzo LOConstruction of powder and cream departments, research and biological laboratories, quality control laboratories.
Approx. surface: 3,000 sqm
Period: from 1988 to 1995